TESDA Photovoltaic NC II Method ยท PEC 2017 Design Margins

Solar PV Sizing Calculator

Work through the same five-step method used in Philippine PV installer training โ€” load analysis, panel sizing, inverter sizing, battery bank, and charge controller โ€” for off-grid, on-grid, or hybrid systems.

System Settings

Sun Peak Hours (PSH)
4.0 hrs/day

Philippines average is ~4โ€“4.5 PSH (lower in rainy season / Luzon north, higher in Mindanao). Adjust to your site's solar resource data.

System DC Voltage

Higher bus voltage = lower current = smaller conductors, per PEC ampacity rules.

Loss / Safety Factor
1.3ร— array oversize

Covers wiring, temperature, dust, and inverter conversion losses โ€” consistent with PEC's continuous-duty margin (conductors/OCPD sized โ‰ฅ125% of load).

Roof / Site Dimensions

Checks whether the physical roof can actually fit the number of panels each mode recommends โ€” not just the electrical sizing.

Roof Length (m) Roof Width (m)
Fire / Access Setback (m)

Clear pathway kept along ridges, hips, and eaves for fire access and maintenance โ€” ~0.9m (3 ft) is a common minimum per fire code and TESDA rooftop-mounting practice.

Usable Roof Area
โ€” mยฒ usable

of โ€” mยฒ total roof area

System Wiring Diagram โ€” Single Line

Interconnection:

PV โ†’ grid-tie inverter โ†’ main distribution panel, with a bi-directional meter for energy export credit.

DC AC

Breaker and SPD ratings shown are sized at 125% of calculated current, per PEC continuous-duty practice โ€” verify against manufacturer datasheets before installation.

01Load Analysis

Average Monthly Consumption (kWh)

Pull this from the customer's electric bill (Meralco / co-op statement, average of last 3โ€“6 months).

03Grid-Tie Inverter Sizing

On-grid inverter is sized to the total array output, not appliance surge โ€” the utility grid absorbs starting currents.

Selected Inverter Rated Power (kW)

Enter the actual inverter model's rated AC power for the EVALUATE check below.

Confirm the inverter's AC output matches your utility's net-metering interconnection requirements and PEC Article 690 disconnect / labeling rules before installation.

02PV Panel Sizing

Panel Rating (W)
Panel Length (m)
Panel Width (m)

Photorealistic PV Layout (Dual MPPT Wiring)

Visual representation showing exactly how the calculated panels are divided across two internal MPPT trackers.

PROBill of Materials (BOM) Export

Enter a valid 9-digit pro code generated by the Solar-Sizing-Code-Generator.html to unlock the detailed BOM export capability. Codes expire after 1 hour.