TESDA Photovoltaic NC II Method ยท PEC 2017 Design Margins

Solar PV Sizing Calculator

Work through the same five-step method used in Philippine PV installer training โ€” load analysis, panel sizing, inverter sizing, battery bank, and charge controller โ€” for off-grid, on-grid, or hybrid systems.

System Settings

Sun Peak Hours (PSH)
4.0 hrs/day

Philippines average is ~4โ€“4.5 PSH (lower in rainy season / Luzon north, higher in Mindanao). Adjust to your site's solar resource data.

System DC Voltage

Higher bus voltage = lower current = smaller conductors, per PEC ampacity rules.

Loss / Safety Factor
1.3ร— array oversize

Covers wiring, temperature, dust, and inverter conversion losses โ€” consistent with PEC's continuous-duty margin (conductors/OCPD sized โ‰ฅ125% of load).

Roof / Site Dimensions

Checks whether the physical roof can actually fit the number of panels each mode recommends โ€” not just the electrical sizing.

Roof Length (m) Roof Width (m)
Fire / Access Setback (m)

Clear pathway kept along ridges, hips, and eaves for fire access and maintenance โ€” ~0.9m (3 ft) is a common minimum per fire code and TESDA rooftop-mounting practice.

Usable Roof Area
โ€” mยฒ usable

of โ€” mยฒ total roof area

System Wiring Diagram โ€” Single Line

Topology:

PV + battery + hybrid inverter, with an automatic transfer switch backing up priority loads when the grid drops.

DC AC Battery link

Breaker and SPD ratings shown are sized at 125% of calculated current, per PEC continuous-duty practice โ€” verify against manufacturer datasheets before installation.

01Load Analysis โ€” Whole House

Average Monthly Consumption (kWh)

Used to size the PV array and hybrid inverter for total household demand.

03Hybrid Inverter & PV String Sizing

Panel Voc (V)
Panel Isc (A)
Inverter Vmax (V)
Total PV Panels Available
MPPT Trackers / Inputs

โš  The stringing below shows the combined array across all MPPT inputs. Most hybrid inverters have 2 or more independent PV inputs โ€” check your inverter's datasheet for a field labeled "Number of MPPT Trackers" or "Independent PV Inputs." The calculator automatically distributes the panels evenly across these inputs.

02PV Panel Sizing

Panel Rating (W)
Panel Length (m)
Panel Width (m)

04Battery Bank โ€” Essential / Backup Loads Only

Hybrid batteries typically back up critical loads, not the whole house โ€” list only what must ride through an outage.

LoadQtyWattsHrs/dayTypeDaily Wh
Non-motorMotor
Backup Daily Consumption0 Wh
Battery Rating (Ah)
Battery Voltage (V)